Projects

Our Project Experience

Explore HBC's portfolio of infrastructure projects across transportation, water resources, traffic engineering, and more.

Project Disciplines

Browse project experience by discipline.

Showing all projects.

NE 2nd Avenue corridor reconstruction

Transportation

NE 2nd Avenue Reconstruction

Full design-build reconstruction that modernized the roadway, drainage, sidewalks, traffic systems, and utilities along a key Miami corridor.

George Bush Boulevard bridge replacement

Traffic Engineering

George Bush Boulevard Bridge Replacement

Traffic engineering for a major bridge replacement, including detour analysis, microsimulation modeling, and corridor safety review.

Advanced Traffic Management System

ITS / TSM&O

Advanced Traffic Management System

Large-scale signal data migration, bench testing, and deployment support for Miami-Dade County's ATMS rollout.

I-75 Alligator Alley environmental education improvements

Lighting / Electrical

I-75 Alligator Alley Environmental Education

Lighting, signing, and pavement marking design for a safer, more accessible rest area along I-75.

Seminole Hollywood pedestrian bridge

Structures

Seminole Hollywood Pedestrian Bridge

Structural and civil engineering for a new pedestrian bridge that improves safety and connectivity across SR-7.

Riviera Beach water treatment plant

Water / Drainage

Riviera Beach Water Treatment Plant Phase 1

Progressive design-build support for an advanced water treatment plant sized at 12.0 MGD with planned expansion to 16.0 MGD.

Wrong-way vehicle detection system

ITS

Wrong-Way Vehicle Detection System

Design and deployment of wrong-way vehicle detection systems across 48 exit ramps on Florida's Turnpike network.

Port Everglades master vision plan

Planning

Port Everglades Master Vision Plan

Traffic, parking, and financial planning support for long-term growth and operations at Port Everglades.

Boynton Beach Boulevard safety improvements

Construction Inspection

Boynton Beach Boulevard Safety Improvements

Construction Engineering and Inspection services for Complete Streets improvements that enhanced safety and multimodal access.

CDWWTP Oxygen Production Facility

Water Infrastructure

CDWWTP Oxygen Production Facility

Design-build support for a new oxygen production facility that replaced aging systems with modern VPSA technology.

SR-817 University Drive corridor widening

Transportation / Roadway

SR-817 / University Drive Widening

Multidisciplinary FDOT District 4 corridor widening support spanning roadway, utilities, planning, signalization, drainage, CEI, ITS, cost estimating, and structures.

Northeast Corridor rail planning study area

Planning / Transit

Northeast Corridor FTA Categorical Exclusion

Data collection and planning support for evaluating commuter rail service along the Florida East Coast Railway corridor in Miami-Dade County.

NW 17th Avenue Bridge over the Miami River

Traffic Engineering

NW 17th Avenue Bridge over the Miami River

Traffic data collection and PD&E support for the rehabilitation of a critical Miami River bridge crossing.

Basin H1 stormwater improvements in Belle Glade

Stormwater / Drainage

Basin H1 Stormwater Improvements

Stormwater infrastructure design and utility coordination for a 48-acre Belle Glade basin bounded by major local streets and canal infrastructure.

Districtwide resurfacing scoping corridor

Planning / Roadway

Districtwide Resurfacing Scoping Reports

FDOT District 6 work program support analyzing existing conditions, project needs, concepts, transit considerations, and transportation system improvements.

SR-25 US-27 Okeechobee Road traffic analysis corridor

Traffic Engineering

SR-25 / US-27 / Okeechobee Road Traffic Analysis

Future traffic and weaving analysis support for planned reconstruction along the SR-25 / US-27 / Okeechobee Road corridor.

Venetian Causeway bridge and Miami skyline

Traffic / Safety

Venetian Causeway Speed Study

Speed data collection, traffic engineering, and safety analysis across the Venetian Causeway bridges from Bayshore Drive to Purdy Avenue.

Johnson Street intersection in Hollywood

Complete Streets

Johnson Street Complete Streets

Planning, traffic, public involvement, drainage, signalization, and roadway support for a complete streets corridor in Hollywood.

Seminole traffic operations field review along SR-7

Traffic Operations

Seminole Tribe Traffic Operations and Safety Study

Traffic operations simulations and safety studies for intersections along SR-7 / US-441 supporting FDOT consideration.

Districtwide traffic operations corridor aerial

Traffic / ITS

Districtwide Traffic Operations Data Collection

Continuing traffic data collection services for FDOT District 4, including turning movement counts and task work order support.

SR-7 US-441 transit corridor bridge and waterfront

Transit Corridor

SR-7 / US-441 Transit Corridor Improvements

Multidisciplinary corridor improvements across intersections, pedestrian facilities, lighting retrofits, ADA ramps, and supporting roadway elements.

Southern Turnpike roadway corridor for CCTV upgrades

ITS / Technology

Southern Turnpike CCTV Upgrades

Utility coordination and deployment support for systemwide CCTV camera upgrades across Florida's Turnpike facilities.

Representative utility corridor excavation work

Water / Wastewater

Small Diameter Water Main Replacement Program

Program management, design support, utility coordination, permitting, project controls, and CEI for Miami-Dade water main replacement work.

Riverwalk North seawall replacement rendering

Structures / Waterfront

Riverwalk North Seawall Replacement

Utility coordination and infrastructure support for a 500-foot seawall replacement west of the Andrews Avenue bridge in Fort Lauderdale.

System-wide queue warning ITS field installation

ITS / CEI

System-Wide Queue Warning on SR-91 and SR-429

CEI and ITS inspection support for systemwide queue warning improvements across multiple Florida counties.

Miami urban intersection for traffic impact analysis reviews

Traffic Planning

City of Miami Traffic Impact Analysis Reviews

Traffic impact study and trip generation review support for development planning, circulation, queuing, parking, pedestrian, transit, and roadway impact analysis.

Boca Rio Road corridor near Palmetto Park Road

Roadway Widening

Boca Rio Road Widening

Roadway widening and safety improvement design with drainage, lighting, ITS, and signalization components along a Palm Beach County corridor.

HBC Engineering Company

Committed to Excellence.

Engineering solutions that move communities forward.